4MW / 12MWh BESS interconnected at 27.6kV Chatham, ON
3MW / 6.9MWh BESS interconnected at 44kV Englehart, ON
50MW / 230kV Substation Leamington, ON
4MW / 12MWh BESS interconnected at 27.6kV London, ON
18MW London District Energy Generation Facility in London, ON
10MW / 15MW BESS Feasibility Study Red Lake, ON
© 2021 JM Energy